Sunday, September 18, 2011

More wall

Things are progressing well in the lydon building site. We have started on the second side of our top level wall. We discovered that steps are bloody difficult to build without being a total safety hazard, so instead we are allowing space for slopes between levels. This also means we can push wheelbarrows around, which will be very helpful once veg production is in full swing.


No comments:

Post a Comment